home > sell > Shaanxi machine room color steel plate installation method, complete sizes
Shaanxi machine room color steel plate installation method, complete sizes
products: Views:13Shaanxi machine room color steel plate installation method, complete sizes 
brand: 北京双大
规格: 1200*2800mm
price: 135.00元/平方米
MOQ: 50 平方米
Total supply: 20000 平方米
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2015-09-24 16:32
 
Details
Shaanxi computer room color steel plate installation method, complete sizes, superb technology, good quality, low price, fast logistics, coming to Beijing Shuangda is a good choice for you, interested friends come and buy it! ! !
Steps/methods for installing color steel plates in machine rooms in Beijing Shuangda:
, Staking out: Stake out according to the drawings and the actual dimensions measured on site (note: center line of the partition wall), with the center line of the two closing edges and the ground The intersection point pops up the center line of the ground rail. Remember, these four lines must be in a vertical plane to ensure that the wall installed in the future is vertical.
. Sky rail: Fix it to the cement ceiling with nails or screws every other time. The installation must be neat and the joints must be reinforced and repaired.
Floor rail: Before installing the floor rail, reserve an installation location for the door and pay attention to the height difference on the ground. If the difference in height of the ground is too large, it must be leveled to reduce the gap without affecting the level adjustment. Fix the floor with nails or screws at intervals. If the ground joints are too large, fill them with caulking compound.
, Edge closing: In order to ensure that the edge closing is neat and consistent, and there is no gap in the connection. The edges should be cut and trimmed according to actual measurements, and the edges should be trimmed evenly after cutting. When closing the edge, pay attention to the interface with the sky rail and skirting board to ensure there is no gap.
Vertical keel: Place a vertical keel every other (half the size of the partition). The uprights on both sides of the door frame are completely fixed up and down without shaking. Add a vertical keel in the opposite direction. If the door leaf is required to be wider than the above, the horizontal columns on the door frame must be strengthened and fixed, and if necessary, they must be welded and fixed.
. Horizontal through-core keels: If the height is required to be greater than 3 meters, one should be placed in the vertical direction.
Wall panels: Install the color steel panels starting from one side in order, and the spacing between connected panels is. Width battens are used between partitions, and standard unit wall panels are all interchangeable.
Request for quotation